  As a wholly-owned subsidiary of Chengdu Xingrong Environment Co., Ltd., Xi'an Xingrong Environment Development Co., Ltd. (hereinafter referred to as “Xi'an Xingrong Environment”) was founded in November 2011 with a registered capital of RMB 200 million. The company boasts sound market-oriented employment mechanism, powerful capital operation strength, top-notch technology and outstanding management capacity, and is well-experienced in operation and management of water service and environmental protection industries. It is committed to construction of sewage treatment plant, investment, operation and management of water service and environmental protection.

  I. Project Overview

  (I) Phase II of Xi’an No. 2 Sewage Treatment Plant: on December 2, 2011, the Concession Agreement for Phase II BOT Project of Xi’an No. 2 Sewage Treatment Plant was signed between Xi'an Xingrong Environment and Xi'an Water Supplies Bureau, with concession period persisting for 30 years. Xi'an Xingrong Environment is responsible for investment, construction and operation of the sewage treatment plant.

  Located at western intersection of Dazhai Road, Yanta District, Xi'an City, the project is designed by CSCEC AECOM Consultants Co., Ltd. and built by Municipal and Environmental Protection Engineering Co., Ltd. of China Railway First Group Co., Ltd. With budgeted total investment of RMB 743 million, the project covers an area of 394 mu. The designed sewage treatment capacity reaches 200,000 tons per day and reversed A2/O process is adopted. Water quality of the plant is in keeping with the Grade IA of Discharge Standard of Pollutants for Municipal Wastewater Treatment Plant (GB18918-2002). The plant provides service for areas starting from South Second Ring Road in the north to South Third Ring Road in the south, starting from Belt Expressway in the west to Yanxiang Road, Qujiang in the east.

  The project was commenced in June 2012, received commissioning and trial operation ahead of time in March 2013, and was officially put into operation on October 10, 2013. The main work was completed and started to dispose sewage on December 24, 2012.

  (II) Phase II of Xi’an No. 1 Sewage Treatment Plant: in August 2012, the Concession Agreement for Phase II BOT Project of Xi’an No. 1 Sewage Treatment Plant was signed between Xi'an Xingrong Environment and Xi'an Water Supplies Bureau, with concession period persisting for 30 years. Xi'an Xingrong Environment is responsible for investment, construction and operation of Phase II of Xi’an No. 1 Sewage Treatment Plant.

  The project is situated off the east of Zaohe River, Xi’an City, and adjoins Daxing Road and Chang'an City of Han Dynasty in the north and south respectively. With designed sewage treatment capacity of 100,000 tons per day, the plant covers an area of 91.788 mu, with budgeted assets of RMB 419,110,400. The plant, by using improved A2/O process that features multi-level nitrogen and phosphorus removal, has designed treatment capacity of 100,000 cubic meters per day. The treated water is discharged into Zaohe River, with quality in keeping with the Grade IA of Discharge Standard of Pollutants for Municipal Wastewater Treatment Plant (GB18918-2002).

  Commenced on March 26, 2013, the project was delayed by cultural relic excavation and comprehensively constructed in the end of July 2013 under the coordination of municipal government and related departments. Main works were completed in the end of December 2013. The plant started to dispose sewage on June 22, 2014, on which preliminary test was also finished. On July 25, 2014, the whole sewage treatment process was achieved and commissioning finished. The plant was officially put into trial operation and environmental protection-related trial operation on October 1, 2014 and on May 19, 2015 respectively.

  (III) Capping and Deodorization: the capping and deodorization project was implemented in both Phase II of Xi’an No. 1 Sewage Treatment Plant and Phase II of Xi’an No. 2 Sewage Treatment Plant by Xi'an Xingrong Environment as agent owner in July 2014. The project was commenced in August 2014, with budgeted investment of RMB 120,417,900 and capable of removing foul gases reaching 63,000 cubic meters per day. The budgeted investment for Phase II of Xi’an No. 1 Sewage Treatment Plant amounted to RMB 23,383,408. On April 27, 2015, the capping and deodorization project for Phase II of Xi’an No. 1 Sewage Treatment Plant passed the preliminary acceptance and was put into trial operation after commissioning.